en | nl |
Urgent Service
Urgent Service
News

Ship maintenance works on dredger Charlock

30 March 2020
Ship maintenance works on dredger Charlock

The dredger Charlock of Van den Herik has been back at our shipyard. Last weekend various priority maintenance works were executed at the dock location, after which the dredger left again.

Among various maintenance works, a store crane had been positioned on the fore ship. Also a bulkhead fitted with Hardox wear plates, pins of the suction tube arm were replaced, six new water tight doors have been installed and paintwork on deck has been executed.